• Privacy
  • Imprint
  • Contact Form
  • COMMAIK
    • Contact Form
    • Imprint
    • Privacy
  • The Villa
    • The top floor
    • The upper floor
    • The first floor
    • The cellar
    • The garden
  • Stories from the construction
    • irrigation
    • Photovoltaics
    • Pool and terrace
    • SmartHome
    • The planning
    • The demolition
    • The installation
    • Machinery
    • Restoration and working techniques
    • This and that
  • Videos
    • Build & Renovate
    • Irrigation
    • Carport
    • Gabions
    • Garden
    • Garden kitchen
    • Pool
    • Smart Home
    • Drying
    • Tutorials
  • TESTED & RATED
    • Heating solutions & energy
    • Outdoor & Garten
    • Pool & garden kitchen
    • Security & Smart Home
    • Tools & DIY
  • COMMAIK
    • Contact Form
    • Imprint
    • Privacy
  • The Villa
    • The top floor
    • The upper floor
    • The first floor
    • The cellar
    • The garden
  • Stories from the construction
    • irrigation
    • Photovoltaics
    • Pool and terrace
    • SmartHome
    • The planning
    • The demolition
    • The installation
    • Machinery
    • Restoration and working techniques
    • This and that
  • Videos
    • Build & Renovate
    • Irrigation
    • Carport
    • Gabions
    • Garden
    • Garden kitchen
    • Pool
    • Smart Home
    • Drying
    • Tutorials
  • TESTED & RATED
    • Heating solutions & energy
    • Outdoor & Garten
    • Pool & garden kitchen
    • Security & Smart Home
    • Tools & DIY
  • Privacy
  • Imprint
  • Contact Form
  • A paving stone staircase is built into the slope leading to the parking lot

    A terraced outdoor area features brick stair steps leading to a paved landing, bordered by gabion walls filled with firewood. Stacks of construction materials and lush green plants are visible nearby. www.commaik.de

    The stairs for the slope in front of our house are finally being tackled. The path from the parking lots will be much shorter in the future with a staircase made of old town cobblestones, which I will build directly into the ground. But first I have to excavate the slope and lay concrete kerbs.

    Weiterlesen

    Ähnliche Beiträge

    A close-up of a black plastic pipe connected to a rusted metal fitting, surrounded by wet, muddy soil and remnants of an old clay pipe—evidence of recent underground plumbing or pipe repair work. www.commaik.de

    A new HT drain is tied into the old clay pipe

    2. January 2018
    Keller unter Wasser War die Trockenlegung umsonst a - Draining and waterproofing basements: Effective measures against moisture and flooding

    Draining and waterproofing basements: Effective measures against moisture and flooding

    24. November 2024
    Two large solar panels, part of a balcony power plant, are mounted on a wooden platform outside a modern house, angled to capture sunlight beneath a partly cloudy sky. www.commaik.de

    Set up 2. balcony power station and connect in series.

    25. March 2022

Autor & Blogger

In this construction diary, we share our experience in the renovation and modernization of our Art Nouveau villa and hope to give a few suggestions and tips to some of you.

commaik.de © 2025
  • Contact Form
  • Privacy
  • Imprint
  • Change privacy settings
  • Cookie policy
  • English
  • Deutsch (German)