Excavating the slope – preparing the ground for the gabion wall
In this video I show how I prepared the slope with the excavator for the new gabion wall. The 30-meter-long slope became 2 meters narrower and at the same time over 2 meters high. The loamy soil was so wet and heavy that I had to work with a larger excavator from the second day onwards.
Click here for the detailed entry: Securing a slope with gabions – preparing the ground with an excavator
Here you can find my playlist with more videos: Slope stabilization with gabions
If you want to see more of me and my projects, feel free to check out my YouTube channel.
-
Price: € 92.69instead of: € 123.52
-
Price: € 13.04instead of: € 13.99
-
Price: € 46.90
-
Price: € 89.95
-
Price: € 38.90
-
Price: € 14.50instead of: € 20.99
Dieser Beitrag ist auch verfügbar auf: English Deutsch