• Privacy
  • Imprint
  • Contact Form
  • COMMAIK
    • Contact Form
    • Imprint
    • Privacy
  • The Villa
    • The top floor
    • The upper floor
    • The first floor
    • The cellar
    • The garden
  • Stories from the construction
    • irrigation
    • Photovoltaics
    • Pool and terrace
    • SmartHome
    • The planning
    • The demolition
    • The installation
    • Machinery
    • Restoration and working techniques
    • This and that
  • Videos
    • Build & Renovate
    • Irrigation
    • Carport
    • Gabions
    • Garden
    • Garden kitchen
    • Pool
    • Smart Home
    • Drying
    • Tutorials
  • TESTED & RATED
    • Heating solutions & energy
    • Outdoor & Garten
    • Pool & garden kitchen
    • Security & Smart Home
    • Tools & DIY
  • COMMAIK
    • Contact Form
    • Imprint
    • Privacy
  • The Villa
    • The top floor
    • The upper floor
    • The first floor
    • The cellar
    • The garden
  • Stories from the construction
    • irrigation
    • Photovoltaics
    • Pool and terrace
    • SmartHome
    • The planning
    • The demolition
    • The installation
    • Machinery
    • Restoration and working techniques
    • This and that
  • Videos
    • Build & Renovate
    • Irrigation
    • Carport
    • Gabions
    • Garden
    • Garden kitchen
    • Pool
    • Smart Home
    • Drying
    • Tutorials
  • TESTED & RATED
    • Heating solutions & energy
    • Outdoor & Garten
    • Pool & garden kitchen
    • Security & Smart Home
    • Tools & DIY
  • Privacy
  • Imprint
  • Contact Form
  • Draining the basement with a new horizontal barrier – conclusion after 9 months

    Keller trocken legen fazit nach 9 Monaten www.commaik.de b - Draining the basement with a new horizontal barrier - conclusion after 9 months

    It is now nine months since our old damp cellar was drained with a retrofitted horizontal barrier – time to take stock. In a building over 100 years old like ours, which was built without the foundation waterproofing that is common today, moisture in the basement is a real challenge. As the rising damp in our cellar became increasingly visible, I installed a new horizontal barrier with injection cream in the thick cellar walls to create a barrier against the ground moisture. In this article, I show in detail what effect the moisture barrier has had, where problems still exist and what other measures seem sensible to keep the cellar…

    Weiterlesen

    Ähnliche Beiträge

    Poolterrasse aus BPC bauen So gelingt die Unterkonstruktion am Hang www.commaik.de 060 - Building a BPC and WPC terrace on a slope - My new pool terrace with recycled boards

    Building a BPC and WPC terrace on a slope – My new pool terrace with recycled boards

    14. May 2025
    Anthbot Genie 600 im Test Kabelloser Maehroboter mit AI RTK – So maeht er wirklich www.commaik.de 062a - Anthbot Genie robotic lawnmower in test: Perfect lawn mowing without cables?

    Anthbot Genie robotic lawnmower in test: Perfect lawn mowing without cables?

    25. April 2025
    gartenkueche bauen dach mit Holzbalken bauen osb schweissbahn commaik.de 161 a - Build your own garden kitchen - Solid half-timbered roof with OSB and welded sheeting

    Build your own garden kitchen – Solid half-timbered roof with OSB and welded sheeting

    22. March 2024

Autor & Blogger

In this construction diary, we share our experience in the renovation and modernization of our Art Nouveau villa and hope to give a few suggestions and tips to some of you.

commaik.de © 2025
  • Contact Form
  • Privacy
  • Imprint
  • Change privacy settings
  • Cookie policy
  • English
  • Deutsch (German)